Optimization of the pricing mechanism in the system of innovative development of investment-building complex

ПОДЕЛИТЬСЯ С ДРУЗЬЯМИ
Авторы


competitor
Russia, Kazan state architecturally -Building university
dkm.ff@mail.ru

Аннотация

Currently, the existing system of pricing allows only describe costs in the production process, it is based on technological standards, which are not all perfect. In a basis of system must be the complex of interrelated normative-methodical and information-reference documents, allowing to determine the cost of construction at three main stages of the investment-construction process: at the stage of budget planning, design and implementation stages of construction and calculations for the executed works.

Ключевые слова

investment-building complex, system of pricing, investment, innovation activity.

Категории статьи:

Read also

Статья также доступна (this article also available):

Рекомендуемая ссылка

Sajfullina Farida Maratovna
Optimization of the pricing mechanism in the system of innovative development of investment-building complex// Современные технологии управления. ISSN 2226-9339. – #9 (9). Номер статьи: 0903. Дата публикации: . Режим доступа: http://sovman.ru/en/article/0903/

Full article text is available only in Russian.
Please select from the menu Russian language and continue reading.


Библиографический список

  1. Kiselev D. Normative rake, or an informal opinion on the problem of pricing in construction // the Journal “SNIP”, 2010, no.5.